Federal & contractor intake Discuss your deployment timeline. Capacity & availability ↗
Deployable infrastructure

Deployable infrastructure for field operations.

Evaluate portable compute for field locations, disaster response, and environments with constrained connectivity. Configuration planning addresses power, cooling, physical access, networking, and the security requirements of the deployment.

Why deployable

Why mission data must be processed on site

Deployable infrastructure is not a reduced version of our platform. It exists because some workloads originate in locations where network connectivity is the least reliable resource available.

Data originates where connectivity is weakest

Sensor, imagery, and telemetry data at field and temporary sites routinely exceeds what the available network can carry. Processing data locally and transmitting only the results is the only practical solution.

Authorization must travel with the hardware

Deploying computing capacity at a new site normally requires a new authorization. A deployable unit operates under an existing, approved authorization, so its security controls travel with the hardware rather than being rebuilt at each destination.

Reliance on connectivity is a risk

If a mission depends on a network connection, that connection is a vulnerability. Deployable units are designed to operate for a defined period without connectivity and to synchronize in a predictable order once it is restored.

Configurations

Three form factors, one baseline

Every configuration runs the same software, verification, and monitoring as a server in any of our twelve facilities. Only the capacity and the method of transport differ.

SLD-1
Flyaway Kit
Transit case
Two-person lift

A single sealed server in a shock-mounted transit case, with local storage and full verification capability. It travels as checked baggage, runs on standard or generator power, and gives a small team a secure server that operates independently of any network connection. Suited to assessment teams, exercises, and program pilots.

Compute
1 host, up to 32 cores
Storage
Up to 30.72TB NVMe
Power
700W, 100 to 240V
Transport
Checked baggage or vehicle
SLD-8
Rack Module
8U shock-mounted frame
Palletized

A shock-mounted, eight-unit rack with integrated networking, power conditioning, and independent management, in a frame rated for air and ground transport. Suited to command posts, mobile operations centers, and program offices that require more than a single server but less than a full facility.

Compute
Up to 4 hosts, 128 cores
Storage
Up to 123TB NVMe
Power
3.5kW, single or dual feed
Transport
463L pallet or vehicle
SLD-40
Containerized Site
20-foot ISO container
Self-contained

A complete, sealed data center within a shipping container, including computing, storage, networking, power conditioning, and cooling, with generator connection and intrusion monitoring. It is installed on a prepared pad, runs on utility or generator power, and operates as a full part of our authorized environment.

Compute
Up to 20 hosts, 640 cores
Storage
Up to 600TB NVMe
Power
40kW, shore or generator
Transport
Road, rail, or sea

Each configuration is built to order under a signed agreement. Computing, storage, and networking are sized for each deployment, as with our permanent facilities. The figures above reflect current maximums per unit rather than fixed specifications.

Capabilities

Capabilities beyond a conventional server

The value of a deployable unit lies in how it protects evidence, encryption keys, and data while it is in transit and in the field.

Full security parity

The processor encrypts workload memory using keys the virtualization software never holds, exactly as in our permanent facilities. A deployed unit provides the same level of security.

Verification on arrival

When first powered on at its destination, the unit produces a signed report confirming it matches the state recorded when it was sealed. We recommend verifying this report before loading any data.

Disconnected operation

Each deployment is planned with a defined period of offline operation. During that period, the unit continues to operate, record activity, and enforce security policy without any connection to our central systems.

Predictable synchronization

When connectivity is restored, data synchronizes in a defined order, following rules agreed during planning. No data is merged or discarded without a record.

Tamper-evident transport

Units ship under numbered seals with a chain-of-custody record. Seals are inspected and logged on receipt, and any broken seal is treated as a security incident.

Secure erasure on command

An authorized operator can destroy encryption keys locally, without a network connection, rendering stored data unrecoverable and producing the required documentation.

Authorization boundary

How our authorization extends to the field

This is typically the first question an authorizing official asks, so we address it directly.

A deployable unit operates as part of the ServLogi Inc. authorized environment, not as a separate system. Each configuration is documented in our system security plan as a defined deployment pattern with its own control allocation. The pattern is approved once, rather than each individual shipment.

Your authorizing official approves the pattern

We provide the deployment pattern, control allocation, and boundary diagram for review before the first unit ships. Later deployments under the same pattern require only notification rather than a new authorization package.

Physical security responsibilities are defined

Because we do not operate the destination site, physical and environmental controls there are documented as the customer’s responsibility, with each control identified, so there is no ambiguity about what is inherited.

Evidence is collected offline

Audit records, access reviews, and scan results are stored locally while offline and delivered once connectivity is restored. Any gaps are clearly recorded rather than filled in afterward, as assessors require.

Impact levels are set during planning

Units supporting Impact Level 5 or 6 work are built, sealed, and handled under the personnel and handling requirements for that level. A unit does not acquire an impact level simply by connecting to a network that has one.

Deployment

From planning to deployment in six steps

The process is the same for a single case or a full container. Only the build time differs.

  1. Scope and pattern reviewWe agree on the configuration, the offline period, the synchronization rules, and the physical security responsibilities at the destination. Your authorizing official reviews the deployment pattern and its control allocation.
  2. Build and baselineHardware is procured and prepared through our own supply chain, configured to the same baseline as our permanent facilities, and its firmware recorded. This record is what the unit is verified against on arrival.
  3. Seal and shipThe unit is sealed with numbered tamper-evident seals and released to the carrier, or to your own logistics team, with a chain-of-custody record.
  4. Receipt and field verificationAt the destination, seals are inspected and logged, the unit is powered on, and it produces a signed verification report. We recommend confirming this report before any data is loaded.
  5. Operate online or offlineThe unit operates under the same security policy, monitoring, and incident response plan as the rest of your deployment. Throughout the agreed offline period, it continues to enforce that policy independently.
  6. Return, synchronize, and sanitizeOn return, the unit synchronizes in the agreed order, and its storage is sanitized in accordance with NIST SP 800-88, with a certificate filed for your engagement. No unit returns to inventory with your data on it.
Environment and transport

What the hardware is built to survive

The figures below reflect the design specifications for the SLD-1 and SLD-8 configurations. Containerized sites are climate controlled and specified according to the installation site.

Operating temperature
0°C to 40°C ambient
Non-operating temperature
-30°C to 60°C
Relative humidity
5% to 90%, non-condensing
Operating altitude
Up to 10,000 ft
Shock and vibration
Tested against MIL-STD-810H methods 514.8 and 516.8
Enclosure
Sealed case, IP54 closed, with pressure relief
Input power
100 to 240V AC, 50/60Hz, generator tolerant
Transport case
ATA 300 Category I rated

Test reports for the specific configuration under consideration, including the methods and profiles used, are provided to verified agencies and cleared contractors under a mutual non-disclosure agreement.

Where they go

Deployments this is built for

These examples illustrate typical use and do not represent a list of customers. Because agency and cleared contractor engagements restrict public attribution, we describe the type of deployment instead.

Forward and expeditionary sites

Computing capacity at locations with intermittent connectivity, where operations must continue uninterrupted when the network is unavailable.

Disaster response and emergency communications

Rapid deployment of dispatch, records, and coordination systems at an incident site when local facilities are unavailable.

Border, port, and inspection

On-site processing for screening and inspection, where transmitting raw data is neither fast nor economical enough to be practical.

Mobile command posts

Command units that relocate on short notice and require their secure servers to move with them under a single, continuous authorization.

Exercises and training ranges

Temporary environments that require full security controls throughout and a documented, secure decommissioning at the end.

Program surge

Additional capacity at a program site for a defined period, without building a facility or seeking a new authorization for a temporary deployment.

Availability

Lead times and allocation

Deployable units draw on the same hardware supply as our permanent facilities and follow the same capacity schedule. We recommend planning around the date you need the unit on site rather than your preferred order date.

Allocation
2027 onward 2026 capacity is fully committed
Lead time
Planning to shipment Quoted per configuration
Support
24/7 Same security operations center as our facilities
Term
Deployment or multi-year Priced per engagement
Next steps

Plan a deployment

Every deployable engagement begins with a location and a date. We recommend starting with one of the following.

Scope a deployment

A working session to review the site, the offline operating period, the right configuration, and the security responsibilities your authorizing official will need to review.

Contact federal operations

Learn about our permanent facilities

Deployable units run the same baseline as our twelve facilities. The hardware, network, and monitoring behind them are fully documented.

Infrastructure

Verify a server report yourself

The verification performed on arrival follows the same procedure as for any other server. Review it to confirm it meets your requirements.

Read the procedure